Home > Construction 1w > Contractors

Contractors

December 28th, 2008 admin Leave a comment Go to comments

Contractors

1991 JOHN DEERE 644E WHEEL LOADER PAYLOADER 11K HOURS PVT CONTRACTOR GD
1991 JOHN DEERE 644E WHEEL LOADER PAYLOADER 11K HOURS PVT CONTRACTOR GD
Paypal   US $35,700.00
1997 CATERPILLAR 436C BACKHOE LOADER CONTRACTOR OWN
1997 CATERPILLAR 436C BACKHOE LOADER CONTRACTOR OWN
Paypal   US $34,500.00
2012 7x16 CAR MATE ENCLOSED CUSTOM CARGO CONTRACTOR TRAILER 7k GVWR BLACK RAMP
2012 7x16 CAR MATE ENCLOSED CUSTOM CARGO CONTRACTOR TRAILER 7k GVWR BLACK RAMP
Paypal   US $6,995.00
UNITED 7x16 PREMIUM SERIES ENCLOSED CONTRACTORS TRAILER
UNITED 7x16 PREMIUM SERIES ENCLOSED CONTRACTORS TRAILER
Paypal   US $6,995.00
Enclosed Cargo Utility Contractor Trailer 26 Foot Long by Tesco
Enclosed Cargo Utility Contractor Trailer 26 Foot Long by Tesco
Paypal   US $4,695.00
Powermatic 14 PM 3000 3 phase contractors grade table saw
Powermatic 14 PM 3000 3 phase contractors grade table saw
Paypal   US $3,740.00
Western Contractor Grade Ultra Mount Snow Plow 75 2010 model Pro Plus
Western Contractor Grade Ultra Mount Snow Plow 75 2010 model Pro Plus
Paypal   US $3,200.00
Sumner 783652 2124 Contractor Lift
Sumner 783652 2124 Contractor Lift
Paypal   US $2,455.93
ELECTRICAL CONTRACTORS SUPPLY LOT Local Pick up Delivery Valley Stream NY
ELECTRICAL CONTRACTORS SUPPLY LOT Local Pick up Delivery Valley Stream NY
Paypal   US $2,199.99
Sumner 784750 Series 2412 Contractor Lift
Sumner 784750 Series 2412 Contractor Lift
Paypal   US $2,043.30
SCAFFOLDING CONTRACTORS LOT
SCAFFOLDING CONTRACTORS LOT
Paypal   US $1,850.00
Affordable Skid Steer Tracks for Contractors w FREE SHIPPING
Affordable Skid Steer Tracks for Contractors w FREE SHIPPING
Paypal   US $1,795.00
Apache Arrow 2 Contractor Pipe Laser
Apache Arrow 2 Contractor Pipe Laser
Paypal   US $1,500.00
DIGI POLE MEASURING MICROMETER EXTENDABLE FOR CONTRACTORS CONSTRUCTION FRAMING
DIGI POLE MEASURING MICROMETER EXTENDABLE FOR CONTRACTORS CONSTRUCTION FRAMING
Paypal   US $1,295.00
Asphalt Sealcoat 45 gal Fast Drying Contractor Grade
Asphalt Sealcoat 45 gal Fast Drying Contractor Grade
Paypal   US $927.00
HVAC Contractor Supplies and Testing Equipment
HVAC Contractor Supplies and Testing Equipment
Paypal   US $1,000.00
Total Station Sokkia Set 2 Professional Surveyor Contractor Engineer
Total Station Sokkia Set 2 Professional Surveyor Contractor Engineer
Paypal   US $1,275.00
Paint Estimating software for the Commercial Painting Contractor CPE V70
Paint Estimating software for the Commercial Painting Contractor CPE V70
Paypal   US $595.00
DeWalt DCAAR422XT Contractor Aluminum Telescoping Truck Rack
DeWalt DCAAR422XT Contractor Aluminum Telescoping Truck Rack
Paypal   US $544.99
Bedslide Contractor Grade
Bedslide Contractor Grade
Paypal   US $500.00
DeWalt DCAVR333 Contractor Aluminum 3 Bar Van Rack
DeWalt DCAVR333 Contractor Aluminum 3 Bar Van Rack
Paypal   US $489.99
Sumner 2124 Contractor Material Handler 24 Lift Height 650 LB Capacity
Sumner 2124 Contractor Material Handler 24 Lift Height 650 LB Capacity
Paypal   US $455.00
CONTRACTOR SERIES PROPANE HEATR 250000 400000 BTU HR
CONTRACTOR SERIES PROPANE HEATR 250000 400000 BTU HR
Paypal   US $450.00
DeWalt DCSM72B Contractor Side Mount Truck Box Black Finish 72
DeWalt DCSM72B Contractor Side Mount Truck Box Black Finish 72
Paypal   US $418.99
2007 Genie SLC 24 Super Contractor Material Lift
2007 Genie SLC 24 Super Contractor Material Lift
Paypal   US $400.00
5HP AIR COMPRESSER HONDA DEWALT CONTRACTOR TYPE
5HP AIR COMPRESSER HONDA DEWALT CONTRACTOR TYPE
Paypal   US $400.00
View Page:   1  2  3  4

contractors?

I was wondering if someone could help me, if you hire a Contractor to renovate a Building, who is responsible for paying the Sub-contractors? the contractor or the Owner who hired the contractor? on Top of that is there Any legel Way that the owner Can be Held accountible to the sub-contractors instead of the General contractor? please help!!

If the contractor hires subcontractors, he is responsible for their payment. If you go Out and hire subcontractors on Your Own, you are legally responsible for payment. If the contractor fails to Pay the subcontractor, the subcontractor can put a Mechanics lien on your property to insure that they will receive payment. Make sure you have a written contract with the contractor outlining every detail, and Never, never pay Off the contractor until Work is completed and you are satisfied with the Quality of work.

Share and Enjoy:
  • Print
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google Bookmarks
  • Blogplay
  1. No comments yet.
  1. No trackbacks yet.