Home > Construction 1w > Level

Level

Level

Custom Built Concrete Leveling Equipment Package
Custom Built Concrete Leveling Equipment Package
Paypal   US $54,490.00
DAVID WHITE LP6 20 Sight Level with carry case
DAVID WHITE LP6 20 Sight Level with carry case
Paypal   US $17,500.00
mobile office container ground level office midwest
mobile office container ground level office midwest
Paypal   US $14,950.00
Huge 21 SECTIONAL Plow VIDEO SELF LEVELING must see POWER ANGLE Lift Ram arctic
Huge 21 SECTIONAL Plow VIDEO SELF LEVELING must see POWER ANGLE Lift Ram arctic
   US $14,699.99
Level Leica Wild N3 INCHES Micrometer Swiss Surveyor
Level Leica Wild N3 INCHES Micrometer Swiss Surveyor
Paypal   US $7,500.00
Level Leica N3 Wild Heerbrugg Metric Swiss Surveyor
Level Leica N3 Wild Heerbrugg Metric Swiss Surveyor
Paypal   US $7,500.00
Level Best 3 point hitch Laser Grader Box Laser Grade ATI
Level Best 3 point hitch Laser Grader Box Laser Grade ATI
Paypal   US $8,000.00
Sokkia SDL1X Advanced Digital Level w BT 360 Deg NEW
Sokkia SDL1X Advanced Digital Level w BT 360 Deg NEW
Paypal   US $6,550.00
Kubota L48 4wd Tractor with BT1100 Backhoe TL1150 Self Leveling Front Loader
Kubota L48 4wd Tractor with BT1100 Backhoe TL1150 Self Leveling Front Loader
   US $5,200.00
Level Zeiss NI 002 the most accurate Yena metric
Level Zeiss NI 002 the most accurate Yena metric
Paypal   US $4,750.00
SPECTRA PRECISION LS920 3D TOTAL LASER LEVEL STATION 20 PLUS PIECE KIT
SPECTRA PRECISION LS920 3D TOTAL LASER LEVEL STATION 20 PLUS PIECE KIT
Paypal   US $4,500.00
RL84 84 Roller Level For Skid Steer
RL84 84 Roller Level For Skid Steer
Paypal   US $4,250.00
40 High Cube Steel Ground Level Container
40 High Cube Steel Ground Level Container
Paypal   US $4,250.00
380 ft Sewer Pipe Wall Snake Video Camera System DVR w Self Leveling Head
380 ft Sewer Pipe Wall Snake Video Camera System DVR w Self Leveling Head
Paypal   US $3,799.99
Trimble Spectra Precision GL722 Level laser with receiververy low hours
Trimble Spectra Precision GL722 Level laser with receiververy low hours
Paypal   US $3,600.00
Roller Level for John Deere Skid Steers Model RL84 Smooth Finish Total Control
Roller Level for John Deere Skid Steers Model RL84 Smooth Finish Total Control
Paypal   US $3,550.00
SELF LEVELING SEWER PIPE VIDEO INSPECTION CAMERA
SELF LEVELING SEWER PIPE VIDEO INSPECTION CAMERA
Paypal   US $3,400.00
Hilger Watts TA 30 Micrometer Water Level
Hilger Watts TA 30 Micrometer Water Level
Paypal   US $3,350.00
Brand New Sokkia SDL30 32X Power Digital Level For Land Surveying
Brand New Sokkia SDL30 32X Power Digital Level For Land Surveying
Paypal   US $3,330.00
Topcon DL 502 32X Electronic Digital Elevation Level
Topcon DL 502 32X Electronic Digital Elevation Level
Paypal   US $3,190.00
Sokkia SDL30 32X Digital Level NEW
Sokkia SDL30 32X Digital Level NEW
Paypal   US $3,125.00
300 ft Sewer Pipe Wall Snake Video Camera System DVR w Self Leveling Head
300 ft Sewer Pipe Wall Snake Video Camera System DVR w Self Leveling Head
Paypal   US $3,099.99
TOPCON ROTATING LAZER LEVEL PACKAGE
TOPCON ROTATING LAZER LEVEL PACKAGE
Paypal   US $2,995.00
Sokkia SDL30 Electronic Digital Level 32X Brand New
Sokkia SDL30 Electronic Digital Level 32X Brand New
Paypal   US $2,975.00
Topcon RL 100 2S Automatic Self leveling Dual Slope Laser Level
Topcon RL 100 2S Automatic Self leveling Dual Slope Laser Level
Paypal   US $2,895.00
Level Zeiss NI005 High Accuracy First Range Surveyor
Level Zeiss NI005 High Accuracy First Range Surveyor
Paypal   US $2,750.00
View Page:   1  2  3  4

What level should the Soil/grass be in comparison to my Pavement?

My backyard is All Dirt Right now and when it rains the dirt turns to Mud and Make my pavement walkway filthy! I'd Like to put grass in but am Not sure what level the soil needs to be.
If it's perfectly level with the pavement will I have mud problems when it rains? Should the soil be Slightly lower?
Also, is it necessary or recommended to Install a Curbing or edging between the grass and pavement?

The soil of the Lawn, not the tips of the grass, should be about 1" below hardscaping.

There are several kinds of headers, or mowbands. I like 6-12" Concrete ones, but there are Lots of different kinds, Wood, Metal, recycled Plastic. I Work for a landsapce Architect and we always put some sort of Barrier between lawns and planting areas, although I cant think of Any specific reason.

Share and Enjoy:
  • Print
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google Bookmarks
  • Blogplay
  1. No comments yet.
  1. No trackbacks yet.