Home > Construction 1w > Manufacturing

Manufacturing

Manufacturing

LaBounty Manufacturing MSD50B Shear Cutter Attachment 32 Opening 9 Reach
LaBounty Manufacturing MSD50B Shear Cutter Attachment 32 Opening 9 Reach
Paypal   US $34,999.99
Mixer and Bowl Hobart Manufacturing
Mixer and Bowl Hobart Manufacturing
Paypal   US $850.00
Rockwell Manufacturing Delta 3 Phase Unisaw
Rockwell Manufacturing Delta 3 Phase Unisaw
Paypal   US $549.00
Sharpe Manufacturing GunRazorHvlpWaterborne13 Mm SHA289389
Sharpe Manufacturing GunRazorHvlpWaterborne13 Mm SHA289389
Paypal   US $409.41
Huck Manufacturing Air Hydraulic Riveter Up To 1 4 HUCAK175A
Huck Manufacturing Air Hydraulic Riveter Up To 1 4 HUCAK175A
Paypal   US $408.89
Sharpe Manufacturing Razor 14 Compliant Alum Cup Primer Base Clear SHA253443
Sharpe Manufacturing Razor 14 Compliant Alum Cup Primer Base Clear SHA253443
Paypal   US $395.33
Sharpe Manufacturing Razor Hvlp 14 Alum Cup Spray Gun SHA253434
Sharpe Manufacturing Razor Hvlp 14 Alum Cup Spray Gun SHA253434
Paypal   US $380.84
Sharpe Manufacturing Razor Hvlp 13 Alum Cup Clear Spray Gun SHA253433
Sharpe Manufacturing Razor Hvlp 13 Alum Cup Clear Spray Gun SHA253433
Paypal   US $369.65
AMK Manufacturing Load Release Roadmag 72in Length RL 72
AMK Manufacturing Load Release Roadmag 72in Length RL 72
Paypal   US $329.99
AMK Manufacturing Roadmag 72in Length R72
AMK Manufacturing Roadmag 72in Length R72
Paypal   US $299.99
White 3M™ 2 Very High Bond Manufacturing Tape
White 3M™ 2 Very High Bond Manufacturing Tape
Paypal   US $295.49
Drywall Compound Mixing Tub home manufacturing remodel
Drywall Compound Mixing Tub home manufacturing remodel
Paypal   US $250.00
24V STARTER MOTOR DROTT MANUFACTURING CRAWLER 35C 40C 50C 880 X880 CASE 336 504
24V STARTER MOTOR DROTT MANUFACTURING CRAWLER 35C 40C 50C 880 X880 CASE 336 504
Paypal   US $249.90
AMK Manufacturing Load Release Roadmag 48in Length RL 48
AMK Manufacturing Load Release Roadmag 48in Length RL 48
Paypal   US $239.99
AMK Manufacturing Roadmag w Wheels 48in Length R48W
AMK Manufacturing Roadmag w Wheels 48in Length R48W
Paypal   US $229.99
Monitor Manufacturing BIN Level Indicator 110 Volts
Monitor Manufacturing BIN Level Indicator 110 Volts
Paypal   US $225.00
Sharpe Manufacturing Razor Hvlp 18 Alum Cup Primer Spray Gun SHA253438
Sharpe Manufacturing Razor Hvlp 18 Alum Cup Primer Spray Gun SHA253438
Paypal   US $219.71
AMK Manufacturing Roadmag 48in Width R 48
AMK Manufacturing Roadmag 48in Width R 48
Paypal   US $209.99
Sharpe Manufacturing Paint Gun Conventional 070 775 Conv Series SHA6835
Sharpe Manufacturing Paint Gun Conventional 070 775 Conv Series SHA6835
Paypal   US $201.05
Wheeler Manufacturing Corp Pipe Cutter
Wheeler Manufacturing Corp Pipe Cutter
Paypal   US $199.99
AMK Manufacturing Load Release Roadmag 36in Length RL 36
AMK Manufacturing Load Release Roadmag 36in Length RL 36
Paypal   US $179.99
AMK Manufacturing Roadmag 36in Length R36
AMK Manufacturing Roadmag 36in Length R36
Paypal   US $159.99
New Global Manufacturing INC 1 4 Ball Vibrator BS 25
New Global Manufacturing INC 1 4 Ball Vibrator BS 25
Paypal   US $149.99
T5 Four Lamp Fluorescent Lights Storage Manufacturing Buildings Garage Shop
T5 Four Lamp Fluorescent Lights Storage Manufacturing Buildings Garage Shop
Paypal   US $148.00
AMK Manufacturing Rolling Magnetic Sweeper 30in Magnet Length MSM
AMK Manufacturing Rolling Magnetic Sweeper 30in Magnet Length MSM
Paypal   US $139.99
White 3M™ 4622 1 1 2 Very High Bond Manufacturing Tape
White 3M™ 4622 1 1 2 Very High Bond Manufacturing Tape
Paypal   US $126.61
View Page:   1  2  3  4

Which of the following statements accurately describes Cost flows in manufacturing firm utilizing JIT?

A. Direct Labor and direct materials are maintained in a WIP account for Long period of Time.
B. Manufacturing Overhead is recordede i the raw materials account.
C. There's Little need to maintain raw materials,WIP,or Finished Good.
D. There's no need to maintain a cost of goods sold account.

I would say C. You have little to no raw materials, which are immediately consumed by the production lines. Items that are being manufactured spend as little time in WIP as possible. Finished goods should be shipped as fast as possible to customers.

Share and Enjoy:
  • Print
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google Bookmarks
  • Blogplay
  1. No comments yet.
  1. No trackbacks yet.