Rods
Rods
![]() |
![]() HOT ROD Garage 3 Car Kit 1008 sq ft US $12,498.00
|
![]() Duro Steel 40x40x18 Metal Building Hot Rod Repair Service Garage Workshop Kit US $8,779.00
|
![]() Steel A20x30x12 Metal Hot Rod Garage Storage Building Clearance Sale Overstock US $4,795.00
|
![]() ROD CHOMPER REBAR CUTTER US $5,100.00
|
![]() Leica Rugby 410DG Dual Grade Laser w Rod Eye Digital US $4,120.00
|
![]() Leica Rugby 410DG Dual Grade Laser w Rod Eye Digital US $4,120.00
|
![]() Steel A20x20x12 Metal Hot Rod Garage Storage Building Clearance Sale Overstock US $3,895.00
|
![]() 76 Skid Steer Grapple Rod Bucket Implement fits Bobcat Gehl JCB Terex CAT ASV US $3,788.00
|
![]() 76 Skid Steer Grapple Rod Bucket fits Bobcat Gehl JCB John Deere New Holland US $3,788.00
|
![]() Skid Steer Rod Grapple Bucket for Bobcat Skidsteer 84 US $3,695.00
|
![]() Skid Steer Rod Grapple Bucket for bobcat Skidsteer US $3,595.00
|
![]() 68 Skid Steer Loader Grapple Rod Bucket fits Kubota US $3,588.00
|
![]() 68 Skid Steer Loader Grapple Rod Bucket Implement for Bobcat John Deere Gehl US $3,588.00
|
![]() 60 Skid Steer Grapple Rod Bucket fits Bobcat Cat Asv John Deere Gehl Takeuchi US $3,388.00
|
![]() Ditch Witch 255SX Honda GX 670 24 HP Motor Trailer Bore Bit and Bore Rods US $3,050.00
|
![]() 2300 PCS 3 8 X 48 16 TPI Continuous 2A Steel Threaded Rod NEW CRATE US $2,995.00
|
![]() 2006 New Toro Bore Heads with Rods Reamer US $2,500.00
|
![]() Used Sokkia SDL30 32X Power Digital Level with New Fiberglass Rod good condition US $2,475.00
|
![]() Sokkia SDL30 32X Power Digital Level W Brand New BGS40 Fiberglass Rod US $2,349.99
|
![]() New Mini Skid Steer Walk Behind Grapple Rod Bucket US $2,188.00
|
![]() NEW Boart Longyear Tunneling Drill Steel Extension Rod Mining 220112 4915 R32 US $2,000.00
|
![]() Sokkia SDL 50 Digital Level BGS50 Fiberglass ROD INCLUDED US $1,800.00
|
![]() Connecting Rod New Case 207 Non Turbo Lot of 24 US $1,800.00
|
![]() Sokkia SDL30 32X Power Digital Level W BGS50 Fiberglass Rod US $1,599.00
|
![]() Spectra LL400 Laser Level w CR600 Receiver Tripod Rod US $1,596.00
|
![]() New 76 Industrial HD Skid Steer Rod Bucket Attachment US $1,588.00
|
How Long will spent nuclear Fuel rods remain Hot if Not placed in Water?
It seems incredibly dangerous that the Only Way these rods don't explode is if they are kept in Pulls of cooled water/boric Acid. What would happen if the Power went Out and the backup Generators failed? Would the rods explode, spewing radiation out into the populous? So how long do these rods generate Heat Like that, upwards of 10,000 degrees? Thanks for the info.
Where are you getting All this? You seem to be alarmed by silly possibilities that are Made up by typical "Anti-nukes" such as a Lot of teachers and professors who only know enough about nuclear energy to be dangerous themselves. The spent nuclear fuel rods remain hot for a Length of Time that depends on the definition of "hot".
After a reactor shuts Down, the reactor Core (fuel) continues to produce "decay heat" From the radioactive decay of the fission Products. The amount of heat thus produced is relatively Small and continues to decay down exponentially, but Never really reaching zero. It does get low enough so quickly that the heat Can be removed simply by being immersed in water and, later, the heat is so low that it can be removed without the immersion of the spent fuel rods in water.
So, the spent fuel in a spent fuel Pool is merely there for Storage and to allow the gradual decay of the heat producing radiation from the unstable fission products. Even without submerging the spent fuel in water, the fuel would not explode. It would simply heat up and melt. If enough of the spent fuel in a spent fuel pool heated up and melted, it is conceivable that it would Drop down to the Bottom of the pool such that the remaining uranium-235 could congregate and get to a configuration such that it would be a critical critical mass again. Thus, the boric acid is Handy since it absorbs neutrons and ensures that spent fuel does not go critical even in a situations where some of the fuel might melt due to lack of Cooling. All that would likely Take several days and would actually be discovered long before anything bad would happen since it is a simple matter to keep Track of the temperature of the water in the spent fuel pool. Then the water could boil for weeks before anything got much above 212 degrees F, the boiling Point of water.
The populous is not at risk since the fuel Pins/rods are easily managed whether before, during, or after they are in the reactor.
So the Electric power going out and generators failing is of Little consequence since power is only needed to recirculate the water in the pool to equalize temperatures and avoid boiling the water until the decay heat is so small that the boiling point can not be reached. We are talking, at the Most, a few weeks. You could also keep adding water to the spent fuel pool manually.
As for temperature, it is of Course possible that spent fuel could heat up to Any temperature as long as no cooling at all was going on.


US $12,498.00
























